Save Green Inc. Save Green, Save Energy, Save Money, Save the planet!

You are here >> Natural Gas Ggenerator

 
 
 
 

Features of Natural Gas Generators:

1.High efficiency: Heat efficiency is about 32% - 40%; The CHP System efficiency can even reach 80%. And the genset uses few water and power itself.
2.Broad scope: The fuel can be coal mine gas (with firedamp content over 5%), high hydrogen content, low heat (over 900kcal), low pressure gas (over 300mmH2O).
3.Rated power range: It can run single or run in grid.
4.Advanced technology: The inflammation technology is our factory's patent, and the genset can be controlled with computer. The key spare part such as timing part, sparkle part, adjusting pressure valve etc. are the advanced products in the world. The generator are produced according to Siemens Technical certificate.
5.Small dimension and weight, easy to install and deliver.
6.Fast on and off. Easy operation and maintenance.
7.It takes little time to build the power station (about one month to build a power station).
8.Safety: The genset has several protection safeguards; In grid, it has self protection function.
9.We can supply the relatied systems, such as coal mine gas send-off system, methane handling system etc., and these systems are both inexpensive and advanced.


Simple specifications of our products:

Mode Rated Power (KW) Rated speed (r/min) Rated Voltage (V) Dimension (l*b*h)mm Weight (KG)
24GF47-T 24 2000 400 2040*1240*1125 1800
40GF-PZ 40 1500 400 2040*700*1350 1250
60GF-PT/I 60 1500 400 2600*850*1650 1750
80GF-PZ 80 1500 400 2840*900*1720 2100
120GF-PZ 120 1500 400 2840*900*1720 2350
180GF-PT 180 1000 400 4175*1715*2295 3800
260GF-PT 260 1000 400 4650*2150*2170 8000
400GF-PT 400 1000 400 5506*1970*2698 12500
500GF-RT 500 1000 400 5925*1970*2698 13500
1200GF 1200 1000 400 6300*2200*3280 25000
2000GF 2000 1000 400 7000*2300*3400 32000

Quality and services guarantee:
1.Quality promise:
We supply the Gas Generator Sets which are accordance with JBT9583.1-1999<>. The information supplied must be enough for the demands of scene installation, running-in, operating safely and fixing. The product quality guarantee time is 12 months or running 1500h after being sold. During this time, once there is any attaint to the parts because of quality, the manufacturer is responsibility for changing it.
2.Our words:
Technical information: According to the scene, we provide the following data to cater for the installation, running, operating and fixing demands. The data includes Station design technics flow chart, Using & maintenance illustration, Leaving factory eligible certificate, testing records, related drawing, tools and other information for installing.
Free guidance to install: We are responsibility for the guidance to install and debug; And it is free to introduce the installation of assistant system.
Free charge to debug: It lasts until it is eligibility.
Training free: To meet customers' demands, we can supply suitable training on operating and fixing. The trainees should manage the operation technology and can get rid of normal trouble. The training time can extend according to condition and content.
3.Services after selling:
After receiving the service request, we do our best to reply in four hours. Any need to handle in scene, we will send workers in 24h. Customer is our direction is our faith. In order to as soon as possible to solve the problem, we usually handle with the problems first and then analyze the reasons carefully. This way can save the customers' time. We have sufficient accessories to meet customers' request.

Installation requirements:
1.The requirement of the set to gas pipe and lubricating oil:
The outside of the pipe connecting with set should be clean, free, in order and the pipes shoud be strictly airproofed to avoid leaking of oil, water, and gas.
2.The requirement while installing gas pipe:
On the pipe, there should be making-pressure-steady equipment dehydrating equipment, check valve and Pressure gauge to control the pressure before gas entering the measuring pressure valve. After installation, it should be checked carefully again before running.
3.Installation of in & out system:
There must be single exhausting pipe with muffler. While designing muffler and pipe, workers should pay more attention to it to avoid water and other feculence back to cylinder.
4.Lubricate system:
The oil used by the set should be stored in clean can. And it should be sufficient deposition and sieved before being used.



 
 
Save Green Tips Latest News Green Energy KeywordsDownloadPricesEco-friendly Green Links